Streamline Tower Las Vegas Condos Has 3rd Largest Concrete Pour
Streamline Tower Las Vegas has 3rd biggest concrete pour in Nevada history.
Streamline Tower’s Las Vegas foundation requires a continuous pour of 6,700 square yards of concrete. 350 cement trucks will be pouring for approximately 14 hours, at 5 pour stations, two at a time. This will be quite a feat, for both coordination and cement production.
Martin-Harris Construction poured the foundation for the new 22-story Streamline Tower condos for sale in downtown Las Vegas. The event took place at Las Vegas Boulevard North and Ogden Street. Thirty-five workers placed the concrete or roughly 670 truck loads worth during the marathon.
Continue reading Streamline Tower Las Vegas Condos Has 3rd Largest Concrete Pour
PermalinkTags: streamline tower las vegas, streamline tower, las vegas condos, martin harris construction |
EMail This Post |
Print This Post |
Comments





